| 11/06/2025 |
4.00 |
Wix 2 |
Steve Cook |
Mowed inside otter fence on flat bank from peg 5 back to peg 6 |
|
| 10/06/2025 |
1.75 |
Wix 2 |
Mark Sherman |
Parking bays, and from top car park to first gate strimmed. |
|
| 10/06/2025 |
2.50 |
Wix 2 |
Ashley Thomas |
Strim and trim steps x 2.cut back overhanging trees on path between peg 5 and 6(back bank). Grasscut said path. |

|
| 10/06/2025 |
3.00 |
Wix 2 |
Steve Cook |
Track all round Wix2 mown so car under bellies won’t get scraped |
|
| 10/06/2025 |
2.50 |
Admin/Memberships/Website Etc. |
Jack Davison |
Building Website System for Volunteer Hours Logging |
|
| 09/06/2025 |
2.00 |
St.Osyth Triangle |
Steve Cook |
Strimmed car park and re-located oxygen meter to the tree in the car park |

|
| 08/06/2025 |
0.50 |
Home Farm |
Jack Davison |
Install of DO Meter Enclosure |
|
| 08/06/2025 |
0.50 |
Wix 2 |
Jack Davison |
Install of DO Meter Enclosure |
|
| 08/06/2025 |
0.50 |
Home Farm |
Steve Cook |
Install of DO Meter Enclosures |
|
| 08/06/2025 |
0.50 |
Wix 2 |
Steve Cook |
Install of DO Meter Enclosures |
|